TXNM ENERGY INC filed this 10-K on Feb 28, 2025
TXNM ENERGY INC - 10-K - 20250228 - BUSINESS
ITEM 1.BUSINESS

THE COMPANY
Overview
TXNM Energy, Inc., formerly PNM Resources, Inc. (“PNMR”), is a holding company with two regulated electric utilities, PNM and TNMP, serving approximately 834,000 residential, commercial, and industrial customers in New Mexico and Texas. PNMR was incorporated in the State of New Mexico in 2000. In 2024, PNMR amended its Articles of Incorporation to change its name to TXNM Energy, Inc. (“TXNM”) and its common stock trades on the New York Stock Exchange under the symbol TXNM.
Vision, Values and Business Objectives
TXNM’s vision is to create a clean and bright energy future while fulfilling its purpose to work together with customers and communities to meet their energy needs. TXNM’s core values of Safety, Caring and Integrity are the foundation for the Company’s business objectives focused on safety excellence and customer satisfaction, including reliability. To reach these objectives, the Company is committed to:

Preparing our workforce with the knowledge and skills to thrive in a customer-focused world
Purposefully delivering an intentional customer experience that exceeds our evolving customer and stakeholder expectations
Enabling an environmentally sustainable future and deploying technologically advanced solutions that empower and benefit customers
Demonstrating the relationship between customer excellence and our dedicated focus on financial strength
Meeting the business objectives above will drive key financial results:

Earning authorized returns on regulated businesses
Delivering at or above industry-average long-term earnings growth, with a dividend payout ratio between 50 and 60 percent of earnings
Maintaining investment grade credit ratings

The Company believes that maintaining strong and modern electric infrastructure is critical to ensuring reliability and supporting economic growth. PNM and TNMP strive to balance service affordability with infrastructure investment to maintain a high level of electric reliability and to deliver a safe and superior customer experience.

Both PNM and TNMP seek cost recovery for their investments through general rate cases, periodic cost of service filings, and various rate riders. Additional information about rate filings is provided in Operations and Regulation below and in Note 17.

Other Information

These filings for TXNM, PNM, and TNMP include disclosures for each entity. For discussion purposes, this report uses the term “Company” when discussing matters of common applicability to TXNM, PNM, and TNMP. Discussions regarding only TXNM, PNM, or TNMP are so indicated. A reference to “MD&A” in this report refers to Part II, Item 7. – Management’s Discussion and Analysis of Financial Condition and Results of Operations. A reference to a “Note” refers to the accompanying Notes to Consolidated Financial Statements.

Financial information relating to amounts of revenue, net earnings, and total assets of reportable segments is contained in MD&A and Note 2.

WEBSITES
The TXNM website is an important source of Company information. New or updated information for public access is routinely posted.  TXNM encourages analysts, investors, and other interested parties to register on the website to automatically receive Company information by e-mail. This information includes news releases, notices of webcasts, and filings with the SEC. Participants will not receive information that was not requested and can unsubscribe at any time.
Our corporate websites are:

TXNM: www.txnmenergy.com
PNM: www.pnm.com
TNMP: www.tnmp.com

A - 1

TXNM’s corporate website includes a dedicated section providing key environmental and other sustainability information related to PNM’s and TNMP’s operations. This information highlights plans for PNM to be coal-free no later than 2031 and to have a carbon-free generating portfolio by 2040.

The contents of these websites are not a part of this Form 10-K and the inclusion of our website address in this report is an inactive textual reference only. The SEC filings of TXNM, PNM, and TNMP, including annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, are accessible free of charge on the TXNM website as soon as reasonably practicable after they are filed with, or furnished to, the SEC. Reports filed with the SEC are available on its website, www.sec.gov. These reports are also available in print upon request from TXNM free of charge.

Also available on the Company’s website at https://www.txnmenergy.com/sustainability/governance/governance-documents and in print upon request from any shareholder are TXNM’s:

Corporate Governance Principles
Code of Ethics (Do the Right Thing Principles of Business Conduct; Supplier Code of Conduct)
Charters of the Audit and Ethics Committee, Nominating and Governance Committee, Compensation and Human Capital Committee, and Finance Committee
Restated Articles of Incorporation and Bylaws

The Company will post amendments to or waivers from its code of ethics (to the extent applicable to the Company’s executive officers and directors) on its website.

OPERATIONS AND REGULATION

Regulated Operations

Electric power demand is generally seasonal. Power consumption in both Texas and New Mexico peaks during the hot summer months with revenues traditionally peaking during that period. The seasonality of demand for electricity in turn impacts the timing of plant maintenance and operating expense throughout the year. As a result, the quarterly operating results of TXNM and its operating subsidiaries vary throughout the year. In addition, unusually mild or extreme weather patterns may cause the overall operating results of the Company to fluctuate. See Notes 16 and 17 for additional information on rate cases and other regulatory matters.

TNMP

Operational Information

TNMP is a regulated utility operating and incorporated in the State of Texas. TNMP’s predecessor was organized in 1925. TNMP provides transmission and distribution services in Texas under the provisions of TECA and the Texas Public Utility Regulatory Act. TNMP is subject to traditional cost-of-service regulation with respect to rates and service under the jurisdiction of the PUCT and certain municipalities. TNMP’s transmission and distribution activities are solely within ERCOT, which is the independent system operator responsible for maintaining reliable operations for the bulk electric power supply system in most of Texas. Therefore, TNMP is not subject to traditional rate regulation by FERC. TNMP serves a market of small to medium sized communities, most of which have populations of less than 50,000. TNMP is the exclusive provider of transmission and distribution services in most areas it serves.

TNMP’s service territory consists of three non-contiguous areas. One portion of this territory extends from Lewisville, which is approximately 10 miles north of the Dallas-Fort Worth International Airport, eastward to municipalities near the Red River, and to communities north, west, and south of Fort Worth. The second portion of its service territory includes the area along the Texas Gulf Coast between Houston and Galveston, and the third portion includes areas of far west Texas between Midland and El Paso. TNMP owns 1,022 miles of electric transmission lines that interconnect with other utilities in Texas. There has been a significant increase in interconnection requests and data center applications on the TNMP system, which has necessitated new transmission stations, upgrades at existing stations, and transmission line capacity upgrades.

TNMP provides transmission and distribution services at regulated rates to various REPs that, in turn, provide retail electric service to consumers within TNMP’s service area.

For its volumetric load consumers billed on KWh usage, TNMP experienced an increase of 1.8% in its weather normalized retail load in 2024 compared to 2023. For its weather normalized demand-based load, excluding retail transmission and data center consumers, TNMP experienced an increase of 2.4% in 2024 compared to 2023. Data center load, including distribution and transmission, has increased 13.7% in 2024 compared to 2023. As of December 31, 2024, 126 active REPs receive transmission and distribution services from TNMP. In 2024, the two largest REPs accounted for 26% and 20% of TNMP’s operating revenues. No other consumer accounted for more than 10% of revenues.

A - 2

TNMP holds long-term, non-exclusive franchise agreements for its electric transmission and distribution services. These agreements have varying expiration dates, and some have expired. TNMP intends to negotiate and execute new or amended franchise agreements with municipalities where the agreements have expired or will be expiring. Since TNMP is the exclusive provider of transmission and distribution services in most areas that it serves, the need to renew or renegotiate franchise agreements should not have a material adverse impact. TNMP also earns revenues from service provided to facilities in its service area that lie outside the territorial jurisdiction of the municipalities with which TNMP has franchise agreements.

Regulatory Activities

The rates TNMP charges customers are subject to traditional rate regulation by the PUCT. The PUCT has approved mechanisms that allow TNMP to recover capital invested in transmission and distribution projects without having to file a general rate case. The PUCT approved interim adjustments to TNMP’s transmission rates of $13.1 million in March 2024 and $3.9 million in September 2024. On January 24, 2025, TNMP filed an application to further update its transmission rates, which would increase revenues by $11.5 million annually. The application is pending before the PUCT. The PUCT approved interim adjustments to TNMP’s distribution revenue requirement of $15.6 million in July 2024 and $7.7 million in November 2024. The PUCT also approved rate riders that allow TNMP to recover amounts related to energy efficiency and third-party transmission costs.

In August 2024, TNMP filed its first SRP with the PUCT designed to benefit customers through enhanced resiliency of its distribution system. The SRP is subject to PUCT approval over 180 days as stated in Texas legislation. In December 2024, TNMP filed an unopposed settlement with the PUCT. The settlement includes $565.8 million of capital investments over 2025 through 2027, reflecting 94% of TNMP’s proposed plan investments. The settlement also encompasses $128.2 million of operations and maintenance expenses associated with several programs, including vegetation management and wildfire mitigation.

PNM

Operational Information

PNM is an electric utility that provides electric generation, transmission, and distribution service to its rate-regulated customers. PNM was incorporated in the State of New Mexico in 1917. PNM’s retail electric service territory covers a large area of north-central New Mexico, including the cities of Albuquerque, Rio Rancho, and Santa Fe, and certain areas of southern New Mexico as well as 9 sovereign nations. Service to retail electric customers is subject to the jurisdiction of the NMPRC. The largest retail electric customer served by PNM accounted for 4.2% of its retail electric revenues for the year ended December 31, 2024. Other services provided by PNM include wholesale transmission services to third parties. Regulation encompasses the utility’s electric rates, service, accounting, issuances of securities, construction of major new generation, abandonment of existing generation, types of generation resources, transmission and distribution facilities, and other matters.

PNM’s weather-normalized residential load increased by 1.5% and its weather normalized commercial load was flat in 2024 compared to 2023. In addition, PNM experienced an increase in industrial load of 12.5% compared to 2023. The system peak demands for retail customers are as follows:

System Peak Demands
202420232022
(Megawatts)
Summer2,147 2,162 2,139 
Winter1,643 1,545 1,526 

PNM holds long-term, non-exclusive franchise agreements for its electric retail operations, with varying expiration dates. These franchise agreements allow the utility to access public rights-of-way for placement of its electric facilities. To the extent franchise agreements expire in some areas PNM serves, PNM remains obligated under New Mexico state law to provide service to customers in these areas, and therefore, the expirations should not have a material adverse impact. The Albuquerque, Rio Rancho, and Santa Fe metropolitan areas accounted for 39.4%, 7.7% and 5.5% of PNM’s 2024 revenues. No other franchise area represents more than 5%. PNM also earns revenues from its electric retail operations in its service areas that do not require franchise agreements.

PNM owns 3,444 miles of electric transmission lines that interconnect with other utilities in New Mexico, Arizona, Colorado, Texas, and Utah. New Mexico is frequently characterized by its high potential for solar and wind capacity. PNM owns transmission capacity in an area of eastern New Mexico with large wind generation potential and in recent years there has been substantial interest by developers of wind generation to interconnect to PNM’s transmission system in this area.


A - 3

Regulatory Activities

NMPRC Regulated Retail Rate Proceedings

In June 2024, PNM filed an application with the NMPRC for a general increase in retail electric rates. The application proposed an increase of $174.3 million in retail revenues which is comprised of a $92.2 million increase in base rates and a $82.1 million increase in revenues collected under PNM’s FPPAC and reflects an ROE of 10.45%. The proposed base rate changes would be implemented in two phases, with the first phase effective July 1, 2025 and the second phase effective January 1, 2026. In November 2024, PNM filed its unopposed comprehensive stipulation with the NMPRC. Key components include an increase of $105.0 million in retail revenues with the first phase effective July 1, 2025 and the second phase effective April 1, 2026, reflecting an ROE of 9.45%.

In October 2024, the NMPRC approved PNM’s Grid Modernization Plan. PNM’s plan to modernize its electricity grid through infrastructure and technology improvements increases the efficiency, reliability, resilience, and security of PNM’s electric system. PNM’s grid modernization investments include approximately $344 million for the first six years of a broader 11-year strategy.

PNM has a NMPRC-approved rate rider to collect costs for renewable energy procurements that are not otherwise being collected in rates. The NMPRC has also approved riders designed to allow PNM to bill and collect substantially all fuel and purchased power costs, costs of approved energy efficiency initiatives, and costs associated with enhancing transportation electrification in New Mexico.

FERC Regulated Wholesale Transmission

Rates charged to wholesale electric transmission customers, other than customers on the Western Spirit Line, are based on a formula rate mechanism pursuant to which rates for wholesale transmission service are calculated annually in accordance with an approved formula. The formula includes updating cost of service components, including investment in plant and operating expenses, based on information contained in PNM’s annual financial report filed with FERC, as well as including projected transmission capital projects to be placed into service in the following year. The projections included are subject to true-up in the formula rate for the following year. Certain items, including changes to return on equity and depreciation rates, require a separate filing to be made with FERC before being included in the formula rate.

Renewable Energy

The REA was enacted to encourage the development of renewable energy in New Mexico. The ETA amended the REA and requires utilities operating in New Mexico to have renewable portfolios equal to 40% by 2025, 50% by 2030, 80% by 2040, and 100% zero-carbon energy by 2045. The REA provides for streamlined proceedings for approval of utilities’ renewable energy procurement plans, provides utilities recovery of costs incurred consistent with approved procurement plans, and sets a RCT for the procurement of renewable resources to prevent excessive costs being added to rates. PNM files required renewable energy plans with the NMPRC annually and makes procurements consistent with the plans approved by the NMPRC.

Corporate and Other

The Corporate and Other segment includes TXNM holding company activities, primarily related to corporate level debt and the activities of PNMR Services Company. PNMR Services Company provides corporate services through shared services agreements to TXNM and all of TXNM’s business units, including PNM and TNMP. These services are charged and billed at cost on a monthly basis to the business units. The activities of PNMR Development and the equity method investment in NMRD are also included in Corporate and Other, until the close of the sale of NMRD on February 27, 2024.

A - 4

SOURCES OF POWER
TNMP

TNMP provides only transmission and distribution services and does not sell power.

PNM
Generation Capacity

PNM’s capacity in electric generating facilities in commercial operation as of December 31, 2024 are as follows:
GenerationPercent of
CapacityGeneration
TypeNameLocation(MW)Capacity
SolarPNM-owned solar
Twenty sites in New Mexico
158 3.7 %
Solar
Britton
Los Lunas, New Mexico50 1.2 
Solar
Encino
Los Lunas, New Mexico50 1.2 
Solar
Encino North
Los Lunas, New Mexico50 1.2 
SolarSolar DirectRio Arriba County, New Mexico50 1.2 
SolarRoute 66Cibola County, New Mexico50 1.2 
Solar
Arroyo
McKinley County, New Mexico
300 7.0 
Solar
Sky Ranch
Valencia County, New Mexico
190 4.5 
Solar
Jicarilla I
Rio Arriba County, New Mexico50 1.2 
Solar
Atrisco
Bernalillo County, New Mexico
300 7.0 
Solar
San Juan
San Juan County, New Mexico
200 4.7 
Solar
Other
Los Lunas, New Mexico30 0.7 
WindNew Mexico WindHouse, New Mexico200 4.7 
WindRed Mesa WindSeboyeta, New Mexico102 2.4 
WindCasa Mesa WindHouse, New Mexico50 1.2 
WindLa Joya Wind ITorrance, New Mexico166 3.9 
WindLa Joya Wind IITorrance, New Mexico140 3.3 
GeothermalLightning Dock GeothermalLordsburg, New Mexico11 0.3 
Renewable resources
2,147 50.3 
Energy storage
PNM-owned battery
Valencia County & Bernalillo County, New Mexico
12 0.3 
Energy storage
Arroyo
McKinley County, New Mexico
150 3.5 
Energy storage
Jicarilla
Rio Arriba County, New Mexico20 0.5 
Energy storage
Sky Ranch
Valencia County, New Mexico
50 1.2 
Energy storage
San Juan
San Juan County, New Mexico
100 2.3 
Energy storage
Atrisco
Bernalillo County, New Mexico
300 7.0 
Energy storage resources
632 14.8 
GasReeves StationAlbuquerque, New Mexico146 3.4 
GasAfton (combined cycle)La Mesa, New Mexico235 5.5 
GasLordsburgLordsburg, New Mexico85 2.0 
GasLuna (combined cycle)Deming, New Mexico190 4.5 
Gas/Oil
Rio Bravo
Albuquerque, New Mexico149 3.5 
GasValenciaBelen, New Mexico155 3.6 
GasLa LuzBelen, New Mexico41 1.0 
Gas-fired resources
1,001 23.5 
NuclearPVNGSWintersburg, Arizona288 6.7 
CoalFour CornersFruitland, New Mexico200 4.7 
4,268 100.0 %
Renewable and Energy Storage Resources

In addition to PNM’s owned and contracted solar facilities, PNM has a customer distributed solar generation program that represented 308.5 MW at December 31, 2024. PNM stores energy under ESAs and purchases renewable power under long-term PPAs, all currently having expiration dates beginning in January 2035 and extending through May 2047. The NMPRC has approved plans for PNM to procure energy and RECs from additional resources to serve retail customers and a data center located in PNM’s service territory, which are expected to be in service by summer of 2026. If adjusted for these approved plans, the table above would reflect the percentage of generation capacity from renewable resources of 52.1%, energy
A - 5

storage resources of 19.2%, nuclear resources of 5.6%, and fossil-fueled resources of 23.1%. In addition, PNM has filed an application with the NMPRC seeking approval of resources to be available for the 2028 summer peak, which are necessary for PNM to meet forecasted peak load requirements to serve its customers and to continue progress towards a carbon-free generating portfolio. These resources and their currently expected operation dates are as follows:

Generation
Expected
Capacity
Type
Resource For
Operation
(MW)
NMPRC Approved
Solar
Meta Data Center
2025140 
Energy storage
Meta Data Center
202550 
Solar
2026 Resource Application
2026100 
Energy storage
2026 Resource Application
2026100 
Energy storage
2026 Resource Application
2026100 
Energy storage
2026 Resource Application
202650 
PNM-owned battery
2026 Resource Application
202660 
600 
NMPRC Approval Pending
Gas
2028 Resource Application
2028167
PNM-owned solar
2028 Resource Application
2028100
PNM-owned battery
2028 Resource Application
202830
Energy storage
2028 Resource Application
2028150
Energy storage
2028 Resource Application
2028150
597

Fossil‑Fueled Plants

Four Corners Units 4 and 5 are 13% owned by PNM. These units are jointly owned with APS, SRP, Tucson, and NTEC, and are operated by APS. PNM had no ownership interest in Four Corners Units 1, 2, or 3, which were shut down by APS in 2013. The Four Corners plant site is located on land within the Navajo Nation and is subject to an easement from the federal government. APS, on behalf of the Four Corners participants, negotiated amendments to extend the owners’ right to operate the plant on the site to July 2041.

PNM owns 100% of Reeves, Afton, Rio Bravo, Lordsburg, and La Luz and one-third of Luna. The remaining interests in Luna are owned equally by Tucson and Samchully Power & Utilities 1, LLC. PNM is also entitled to the entire output of Valencia under a PPA. Reeves, Lordsburg, Rio Bravo, La Luz, and Valencia are used primarily for peaking power and transmission support. As discussed in Note 10, Valencia is a variable interest entity and is consolidated by PNM.

Nuclear Plant

PNM is participating in the three units of PVNGS with APS (the operating agent), SRP, EPE, SCE, SCPPA, and the Department of Water and Power of the City of Los Angeles. PNM has ownership interests of 2.3% in Unit 1, 9.4% in Unit 2, and 10.2% in Unit 3. See Note 16 for information on other PVNGS matters.

Purchased Power

PNM engages in activities to optimize its existing jurisdictional assets and long-term power agreements through transacting in the hour-ahead, day-ahead, week-ahead, and month-ahead bilateral markets that allows PNM to market any excess generation not required to fulfill retail load and contractual commitments.

PNM participates in the EIM, a real-time wholesale energy trading market operated by CAISO, which enables participating electric utilities to buy and sell energy, which has generated cost savings that are passed through to customers under PNM’s FPPAC. PNM also plans to join the EDAM, which is a voluntary day-ahead regional market that expands on CAISO’s EIM market, as early as 2027. PNM also engages in activities to optimize its existing jurisdictional assets and long-term power agreements through transacting in the hour-ahead, day-ahead, week-ahead, and month-ahead bilateral markets that allows PNM to market any excess generation not required to fulfill retail load and contractual commitments. PNM joined the WRAP in April 2023, which is a first-of-its-kind program in the West that adds a region-wide coordination between power providers for assessing and addressing resource adequacy. WRAP is currently in the non-binding phases of the program, which is expected to continue through the summer of 2027.


A - 6

Plant Operating Statistics

Equivalent availability of PNM’s major base-load generating stations was:
PlantOperator20242023
Four CornersAPS78.1%61.2%
PVNGSAPS91.891.4
Joint Projects

SJGS, PVNGS, Four Corners, and Luna are joint projects each owned or leased by several different entities. Some participants in the joint projects are investor-owned entities, while others are privately, municipally, tribally, or co-operatively owned. Furthermore, participants in SJGS had varying percentage interest in different generating units within the project and have different percentage interest with respect to plant decommissioning and coal mine reclamation obligations.

The primary operating or participation agreements for the other joint projects expire July 2041 for Four Corners, December 2046 for Luna, and November 2047 for PVNGS. As described above, Four Corners is located on land within the Navajo Nation and is subject to an easement from the federal government.

It is possible that other participants in the joint projects have circumstances and objectives that have changed from those existing at the time of becoming participants. The status of these joint projects is further complicated by the uncertainty surrounding the form of potential legislation and/or regulation of GHG, other air emissions, and CCRs, as well as the impacts of the costs of compliance and operational viability of all or certain units within the joint projects. It is unclear how these factors will enter into discussions and negotiations concerning the status of the joint projects as the expiration of basic operational agreements approaches. PNM can provide no assurance that its participation in the joint projects will continue in the manner that currently exists.

FUEL
PNM
The percentages (on the basis of KWh) of PNM’s generation of electricity, including Valencia, fueled by coal, nuclear fuel, and gas and oil, and the average costs to PNM of those fuels per MMBTU were as follows:
 CoalNuclearGas
 Percent of
Generation
Average
Cost
Percent of
Generation
Average
Cost
Percent of
Generation
Average
Cost
20248.2 %$8.81 43.3 %$0.86 41.2 %$0.97 
202312.8 4.19 32.3 0.73 49.9 3.42 

In 2024 and 2023, 7.3% and 5.0% of PNM’s generation was from utility-owned solar, which has no fuel cost. Due to locally available natural gas, the utilization of locally available coal deposits, and the generally adequate supply of nuclear fuel, PNM believes that adequate sources of fuel are available for its generating stations into the foreseeable future. PNM recovers substantially all of its fuel and purchased power costs through the FPPAC.

Coal

Four Corners obtains its coal requirements from a mine near the plant. The coal supply arrangement for Four Corners runs through July 6, 2031 and provides for pricing adjustments over its term based on economic indices. See Note 16 for additional information about PNM’s coal supply arrangements. See Note 17 for additional information about PNM’s SJGS Abandonment Application, PNM’s Four Corners Abandonment Application, and PNM’s IRP, which all focus on a carbon-free electricity portfolio by 2040.
Natural Gas
The natural gas used as fuel for the electric generating plants is procured on the open market and delivered by third-party transportation providers. The supply of natural gas can be subject to disruptions due to extreme weather events and/or pipeline or facility outages. PNM has contracted for firm gas transmission capacity to minimize the potential for disruptions due to extreme weather events. Certain natural gas plants of PNM’s are generally used as peaking resources that are highly relied upon during seasonally high load periods and/or during periods of extreme weather, which also may be the times natural gas has the highest demand from other users.

A - 7

Nuclear Fuel and Waste

PNM is one of several participants in PVNGS. The PVNGS participants are continually identifying their future nuclear fuel resource needs and negotiating arrangements to fill those needs. Additional needed supplies are covered through existing inventories or spot market transactions. The PVNGS participants have contracted for 100% of PVNGS’s requirements for uranium concentrates through 2025 and an average of 50% through 2030. For conversion services, 100% are contracted through 2025 and an average of 86% through 2030. For enrichment services an average of 75% is contracted through 2028. For fuel assembly fabrication 100% is contracted through 2027.
The Nuclear Waste Policy Act of 1982 required the DOE to begin to accept, transport, and dispose of spent nuclear fuel and high-level waste generated by the nation’s nuclear power plants by 1998. The DOE’s obligations are reflected in a contract with each nuclear power plant. The DOE failed to begin accepting spent nuclear fuel by 1998. APS (on behalf of itself and the other PVNGS participants) pursued legal actions for which settlements were reached. See Note 16 for information concerning these actions.
The DOE had planned to meet its disposal obligations by designing, licensing, constructing, and operating a permanent geologic repository at Yucca Mountain, Nevada. In March 2010, the DOE filed a motion to dismiss with prejudice its Yucca Mountain construction authorization application that was pending before the NRC. Several legal proceedings followed challenging DOE’s withdrawal of its Yucca Mountain construction authorization application. None of these lawsuits have been conclusively decided. However, the DC Circuit ordered the NRC to resume its review of the application. The results of the NRC’s review publications do not signal whether or when the NRC might authorize construction of the repository.

All spent nuclear fuel from PVNGS is being stored on-site. PVNGS has sufficient capacity at its on-site ISFSI to store all of the nuclear fuel that will be irradiated during the initial operating license periods, which end in December 2027. Additionally, PVNGS has sufficient capacity at its on-site ISFSI to store a portion of the fuel that will be irradiated during the extended license periods, which end in November 2047. If uncertainties regarding the U.S. government’s obligation to accept and store spent fuel are not favorably resolved, the PVNGS participants will evaluate alternative storage solutions. These may obviate the need to expand the ISFSI to accommodate all of the fuel that will be irradiated during the extended license periods.

ENVIRONMENTAL MATTERS

Electric utilities are subject to stringent laws and regulations for protection of the environment by local, state, federal, and tribal authorities. In addition, PVNGS is subject to the jurisdiction of the NRC, which has the authority to issue permits and licenses and to regulate nuclear facilities in order to protect the health and safety of the public from radioactive hazards and to conduct environmental reviews. The liabilities under these laws and regulations can be material. In some instances, liabilities may be imposed without regard to fault, or may be imposed for past acts, whether or not such acts were lawful at the time they occurred. See MD&A – Other Issues Facing the Company – Climate Change Issues for information on GHG. In addition, Note 16 contains information related to the following matters, incorporated in this item by reference:

PVNGS Decommissioning Funding
Nuclear Spent Fuel and Waste Disposal
The Energy Transition Act
Environmental Matters under the caption “The Clean Air Act”
Cooling Water Intake Structures
Effluent Limitation Guidelines
Santa Fe Generating Station
Environmental Matters under the caption “Coal Combustion Residuals Waste Disposal”

COMPETITION

Regulated utilities are generally not subject to competition from other utilities in areas that are under the jurisdiction of state regulatory commissions. In New Mexico, PNM does not have direct competition for services provided to its retail electric customers. In Texas, TNMP is not currently in any direct retail competition with any other regulated electric utility. However, PNM and TNMP are subject to customer conservation and energy efficiency activities, as well as initiatives to utilize alternative energy sources, including self-generation, or otherwise bypass the PNM and TNMP systems.

PNM is subject to varying degrees of competition in certain territories adjacent to or within the areas it serves. This competition comes from other utilities in its region as well as rural electric cooperatives and municipal utilities.  PNM is involved in the generation and sale of electricity into the wholesale market to serve its New Mexico retail customers.  PNM is subject to competition from regional utilities and merchant power suppliers with similar opportunities to generate and sell energy at market-based prices and larger trading entities that do not own or operate generating assets.

A - 8

HUMAN CAPITAL RESOURCES

TXNM depends on over 1,600 dedicated employees to deliver outstanding customer service and transform into a carbon-free generation future.

Culture

Our inclusive workforce makes the Company successful through our core values of safety, caring, and integrity. Our culture fosters an accountability and behavioral mindset to sustain shared purpose. Transparency, collaboration, and innovation create both individual and organizational focus on achieving key results. Aligned with the core value of safety, we continued an in-depth safety culture initiative with training and actionable plans integrated into leadership development. In addition, we incorporate mental and physical well-being into our culture through a robust employee wellness program.

Talent Management and Total Rewards

We seek to attract and retain a highly skilled workforce by offering competitive compensation and benefits as well as opportunities for career advancement. Total compensation packages are reviewed regularly to ensure competitiveness within the industry and consistency with performance levels. We are committed to leadership development and mentorship programs, which ensure our leaders’ success and provide diverse learning plans for all employees.

Diversity and Inclusion

Our core values also drive a culture committed to diversity and inclusion. Our diverse workforce enables the Company to provide exceptional value to our customers and stakeholders. Our 1,695 employees include 35% represented by a bargaining unit, 27% women, 56% minorities, 15% identified as disabled, and 9% veterans. Our diversity goal at the Company is for our workforce to mirror the communities we serve. To enhance diversity, we take a multi-tiered approach, including required training for all employees on topics including Americans with Disability Act and diversity in the workplace and leaders are trained in unconscious bias, incorporating diversity into our hiring process and undertaking targeted recruitment with organizations supporting diverse candidates. Compensation equity is reviewed three times per year, and we perform a robust annual succession planning process, including an evaluation of our programs for diversity and inclusion.

Governance

The Board agrees that human capital management is an important component of TXNM’s continued growth and success, and is essential for its ability to attract, retain and develop talented and skilled employees. Management regularly reports to the Compensation and Human Capital Committee of the Board on human capital management topics, including corporate culture, diversity and inclusion, employee development and compensation and benefits. The Compensation and Human Capital Committee has oversight of talent retention and development and succession planning, and the Board provides input on important decisions in each of these areas.

Employees
The following table sets forth the number of employees of TXNM, PNM, and TNMP as of December 31, 2024:
TXNM
PNMTNMP
Corporate (1)
444 — — 
PNM868 868 — 
TNMP383 — 383 
   Total1,695 868 383 
(1) Represents employees of PNMR Services Company.

As of December 31, 2024, PNM had 380 employees in its power plant and operations areas that are currently covered by a collective bargaining agreement with the IBEW Local 611 that is in effect through April 30, 2026. As of December 31, 2024, TNMP had 206 employees represented by IBEW Local 66 covered by a collective bargaining agreement that is in effect through August 31, 2027. The wages and benefits for PNM and TNMP employees who are members of the IBEW are typically included in the rates charged to electric customers and consumers, subject to approval of the NMPRC and PUCT.

DISCLOSURE REGARDING FORWARD LOOKING STATEMENTS

Statements made in this filing that relate to future events or TXNM’s, PNM’s, or TNMP’s expectations, projections, estimates, intentions, goals, targets, and strategies are made pursuant to the Private Securities Litigation Reform Act of 1995. Readers are cautioned that all forward-looking statements are based upon current expectations and estimates and apply only as of the date of this report. TXNM, PNM, and TNMP assume no obligation to update this information.
A - 9

Because actual results may differ materially from those expressed or implied by these forward-looking statements, TXNM, PNM, and TNMP caution readers not to place undue reliance on these statements. TXNM’s, PNM’s, and TNMP’s business, financial condition, cash flows, and operating results are influenced by many factors, which are often beyond their control, that can cause actual results to differ from those expressed or implied by the forward-looking statements. These factors, which are neither presented in order of importance nor weighted, include:

The ability of PNM and TNMP to recover costs and earn allowed returns in regulated jurisdictions and the impact on service levels for PNM customers if the ultimate outcomes do not provide for the recovery of costs and operating and capital expenditures, as well as other impacts of federal or state regulatory and judicial actions
The ability of the Company to successfully forecast and manage its operating and capital expenditures, including aligning expenditures with the revenue levels resulting from the ultimate outcomes of regulatory proceedings
Uncertainty surrounding the status of PNM’s participation in jointly-owned generation projects
Uncertainty regarding the requirements and related costs of decommissioning power plants and reclamation of coal mines, as well as the ability to recover those costs from customers, including the potential impacts of current and future regulatory proceedings
The impacts on the electricity usage of customers and consumers due to performance of state, regional, and national economies, energy efficiency measures, weather, seasonality, alternative sources of power, advances in technology, and other changes in supply and demand
Uncertainty related to the potential for regulatory orders, legislation or rulemakings that provide for municipalization of utility assets or public ownership of utility assets, including generation resources, or which would delay or otherwise impact the procurement of necessary resources in a timely manner
The Company’s ability to maintain its debt, including convertible debt, and access the financial markets in order to repay or refinance debt as it comes due and for ongoing operations and construction expenditures due to disruptions in the capital or credit markets, actions by ratings agencies, and fluctuations in interest rates resulting from any negative impacts from regulatory proceedings, actions by the Federal Reserve, geopolitical activity, or the risk of wildfires and storms
The risks associated with the cost and completion of generation, transmission, distribution, and other projects, including uncertainty related to regulatory approvals and cost recovery, the ability of counterparties to meet their obligations under certain arrangements (including renewable energy resources, approved PPAs and ESAs), and supply chain or other outside support services that may be disrupted
The potential unavailability of cash from TXNM’s subsidiaries due to regulatory, statutory, or contractual restrictions or subsidiary earnings or cash flows
The performance of generating units, transmission systems, and distribution systems, which could be negatively affected by operational issues, fuel quality and supply chain issues (disruptions), unplanned outages, extreme weather conditions, wildfires, storms, terrorism, cybersecurity breaches, and other catastrophic events, including the costs the Company may incur to repair its facilities and/or the liabilities the Company may incur to third parties in connection with such issues beyond the extent of insurance coverage
State and federal regulation or legislation relating to environmental matters and renewable energy requirements, the resultant costs of compliance, and other impacts on the operations and economic viability of PNM’s generating plants
State and federal regulatory, legislative, executive, and judicial decisions and actions on ratemaking, and taxes, including guidance related to the interpretation of changes in tax laws, the Inflation Reduction Act of 2022, the Infrastructure Investment and Jobs Act, and other matters
Risks related to climate change, including potential financial and reputational risks resulting from increased stakeholder scrutiny related to climate change, litigation, legislative and regulatory efforts to limit GHG, including the impacts of the ETA
Employee workforce factors, including cost control efforts and issues arising out of collective bargaining agreements and labor negotiations with union employees
Variability of prices and volatility and liquidity in the wholesale power and natural gas markets, including the impacts to transmission margins
Changes in price and availability of fuel and water supplies, including the ability of the mine supplying coal to Four Corners and the companies involved in supplying nuclear fuel to provide adequate quantities of fuel
Regulatory, financial, and operational risks inherent in the operation of nuclear facilities, including spent fuel disposal uncertainties
The impacts of decreases in the values of marketable securities maintained in trusts to provide for decommissioning, reclamation, pension benefits, and other postretirement benefits, including potential increased volatility resulting from actions by the Federal Reserve to address inflationary concerns, and international developments
Uncertainty surrounding counterparty performance and credit risk, including the ability of counterparties to supply fuel and perform reclamation activities and impacts to financial support provided to facilitate reclamation and decommissioning at SJGS
The effectiveness of risk management regarding commodity transactions and counterparty risk
The outcome of legal proceedings, including the extent of insurance coverage
Changes in applicable accounting principles or policies

A - 10

For information about the risks associated with the use of derivative financial instruments see Part II, Item 7A. “Quantitative and Qualitative Disclosures About Market Risk.”

SECURITIES ACT DISCLAIMER

Certain securities described in this report have not been registered under the Securities Act of 1933, as amended, or any state securities laws and may not be reoffered or sold in the United States absent registration or an applicable exemption from the registration requirements of the Securities Act of 1933 and applicable state securities laws. This Form 10-K does not constitute an offer to sell or the solicitation of an offer to buy any securities.